Gibbs Station 2-LR 931029 (04) ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wiscons,n St COMPRESSION TEST
Suite 1 O0
Dallas. Texas 75229
(214) 620-8911
TFSTEDFOR GIBBS STATION, LTD DATE. 10/29/<)3
C/O HEATH & KNIGHT PROPERTIES
D~LLAS, TEXAS
..OJECT GIBBS STATION OURREPORTNO. <)33B4-4B
PHASE II
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT PAVEPIENT CREEK CROSSING
STA. 12+OO
DATE PLACED 10/2<)/93 PLANT ON SITE
TIME 11: SO DELIVER TICKET NO. N/A
SLUMP 2" MiX PROPORTIONS (SSD)
AIR CONTENT S .3 CEMENT N/A
AIR TEMPERATURE 71 WATER
CONCRETE TEMPERATURE 70 FINE AGGREGATE
DATE RECEIVED 10/30/<)3 COARSE AGGREGATE
FIELD DATA SUBMITTED aY O~ ADMIXTURE
MIX DATA SUBMITTED BY LH LACY
REMARKS
COMPRESSION TEST RESULTS ~-~/Cy
(NOMINAL CYLINDER SIZE 6" X 12"l finders made by ALPHA
representative.
Lab. Customer Type Date ~e Comprlllwe __ Cylinders made by Architect's
No. No. Curing Te~ted Days Strength, Psi or Contractor's representative.
57 93384 LAB 11/0,5/93 7 4210 ~, ylinders picked up by ALPHA
laboratory.
58 93384 LAB 11/26/93 28 [] Cylinders delivered to ALPHA
laboratory.
59 <)3384 LAB 11/26/<)3 28 ~ Compression test results comply with
applicable specifications.
(,0 <)3384 LAB HOLD ~ CompreSSion test results do n(X comply
with applicable specifications.
,s;'..c '.:a,.ors 28 3(:,00
TYPE OF FRACTURE. IF OTHER
T,,~. CONICAL
Re.~c{/f ully Submitted