Loading...
Gibbs Station 2-LR 931029 (05) ALPHA TESTING, INC. REPORT OF CONCRETE 2209 W scons,n St COMPRESSION TEST Su~te 1 O0 Dallas. Texas 75229 · .,' (214) 620-8911 TESTEDFOR GIBBS STATION, LTD DATE: 10/29/93 CIO HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT GIBBS STATION OURREPORTNO. 93384--47 PHASE II COPPELL, TEXAS FIELD DATA LOCATION OF CONCRETE PLACEMENT PAVENENT CREEK CROSSTNG STA. 15+00 DATE PLACED 10/29/93 PLANT ON SITE TIME 11: 05 DELIVER TICKET NO. SLUMP 2" MIX PROPORTIONS (SSD) AlE CONTENT 5.1 CEMENT AIR TEMPERATURE 76 WATER CONCRETE TEMPERATURE 72 FINE AGGREGATE DATE RECEIVED 10/30/93 COARSE AGGREGATE FIELD DATA SUBMITTED BY D~J ADMIXTURE MIX DATA SUBMI'I-I'EO BY LH LACY REMARKS COMPRESSION TEST RESULTS {NOMINAL CYLINDER SIZE 6" X 12"l ~'~'~"Cylinders made by ALPHA representative. Lab. Cultomer Typ~ Da~e I, O~A~ys Compremmve __-- Cylinders made by Architect's No. No. Curir~ I Tarred ti Strength, Psi or Contractor's representative. : 53 93384 LAB 11/05/93 ! 7 3760 .~' Cylinders p,cked up by ALPHA laboratory. 54 93384 { LAB 11/26/93 28 ~880 L-- Cylinders delivered to ALPHA ~ laboratory. 55 93384 LAB 11/26/c)3 28 5~,80 ~""~:)mpresslon test results comply with applicable specifications. 56 93384 LAB HOLD i~ CompreSSion test results do nol comply w~th applicable specifications. TYPE~RE, IF OTHER