Loading...
Gibbs Station 2-LR 931029 (07) ALPHA TESTING, INC. REPORT OF CONCRETE 2209 W,scons,n St COMPRESSIONTEST Suite 100 ..y/.,. Dallas. Texas 75229 .', (214) 620-8911 TE%TEDFOR GIBBS STATION, LTD DATE' 10/2'9/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT GIBBS STATION OUR REPORT NO. 93384--46 Pt'I~SE I I COPPELL, TEXAS FIELD DATA LOCATION OF CONCRETE PLACEMENT PAVEPIENT CREEK CROSSING STA. 18+00 DATE PLACED 10/29/93 PLANT ON SITE TIME 8: 45 DELIVER TICKET NO. SLUMP 2 .5" MIX PROPORTIONS (SSD) AIR CONTENT S. 3 CEMENT AIR TEMPERATURE 69 WATER CONCRETE TEMPERATURE 72 FINE AGGREGATE DATE RECEIVED 10/30/93 COARSE AGGREGATE FIELD DATA SUBMITTED BY D~J ADMIXTURE MIX DATA SUBMITTED BY EH LACY REMARKS COMPRESSION TEST RESULTS .~,....-- (NOMINAL CYLINDER SIZE 6" X 12") ~ Cylinders made by ALPHA representative. Lab. Customer i Type Date ~ Comprm~ve i __ Cylinders made by Architect's No. No. i Curing i Te~tad Days S~angth, Psi I or Contractor's representative. 49 93384 LAB 11/05/93 7 4010 ~-'"'/Cylinders picked up by ALPHA laboratory. 50 93384 LAB 11/26/c)3 28 5400 ~ Cylinders delivered to ALPHA laboratory. ,51 93384 LAB 11/26/93 28 .6050 ~"~mpress~on test results comply with applicable specifications. 52 93384 LAB HOLD ; ~] CompreSSion test results do no~ comply ~ w~th applicable specificahons. -- I ! ,:~,. o-~. 28 ; 3600 i TV~E. IF OTHER ~'--~~~".~et-t:ner