Gibbs Station 2-LR 931029 (07) ALPHA TESTING, INC. REPORT OF CONCRETE
2209 W,scons,n St COMPRESSIONTEST
Suite 100
..y/.,. Dallas. Texas 75229
.', (214) 620-8911
TE%TEDFOR GIBBS STATION, LTD DATE' 10/2'9/93
C/O HEATH & KNIGHT PROPERTIES
DALLAS, TEXAS
PROJECT GIBBS STATION OUR REPORT NO. 93384--46
Pt'I~SE I I
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT PAVEPIENT CREEK CROSSING
STA. 18+00
DATE PLACED 10/29/93 PLANT ON SITE
TIME 8: 45 DELIVER TICKET NO.
SLUMP 2 .5" MIX PROPORTIONS (SSD)
AIR CONTENT S. 3 CEMENT
AIR TEMPERATURE 69 WATER
CONCRETE TEMPERATURE 72 FINE AGGREGATE
DATE RECEIVED 10/30/93 COARSE AGGREGATE
FIELD DATA SUBMITTED BY D~J ADMIXTURE
MIX DATA SUBMITTED BY EH LACY
REMARKS
COMPRESSION TEST RESULTS .~,....--
(NOMINAL CYLINDER SIZE 6" X 12") ~ Cylinders made by ALPHA
representative.
Lab. Customer i Type Date ~ Comprm~ve i __ Cylinders made by Architect's
No. No. i Curing i Te~tad Days S~angth, Psi I or Contractor's representative.
49 93384 LAB 11/05/93 7 4010 ~-'"'/Cylinders picked up by ALPHA
laboratory.
50 93384 LAB 11/26/c)3 28 5400 ~ Cylinders delivered to ALPHA
laboratory.
,51 93384 LAB 11/26/93 28 .6050 ~"~mpress~on
test
results
comply
with
applicable specifications.
52 93384 LAB HOLD ; ~] CompreSSion test results do no~ comply
~ w~th applicable specificahons.
--
I !
,:~,. o-~. 28 ; 3600 i TV~E. IF OTHER
~'--~~~".~et-t:ner