Loading...
Gibbs Station 1-LR 921105 (3)ALPHA TESTING,..~C. 2209 Wisconsin St. Suite 100 Dallas, Texas 75229 (214) 620-8911 ,,,..~ MECHANICAL LIME STABILIZATION REPORT FINAL MIX TESTED FOR HEATH & KNIGHT PROPERTIES DALLAS, TEXAS DATE NOVEMBER 5, 1992 PROJECT Area of Work: GIBBS STATION/LAKES OF COPPELL COPPELL, TEXAS STREETS AND ALLEYS OUR REPORT NO. 92020-103B 11/03/92 Date lime initially applied Date of final mixing 11/05/92 Average final compacted depth: inches. Sample Location WARREN CROSSING, STATION 1+00 WARREN CROSSING,,STATION 4+00 WARREN CROSSING, STATION 7+00 ALLEY F-l, STATION 11+00 ALLEY F-l, STATION 14+00 BROWN TRAIL, STATION 1+00 BROWN TRAIL, STATION 4+00 ALLEY F-3, STATION 1+50 ALLEY F-3, STATION 4+50 MILL TRAIL, STATION 1+00 MILL TRAIL, STATION 4+00 TEST DATA Passing %//,', ieve -'~10~) % Passing f~4 Sieve 75 100 74 100 77 100 68 100 70 100 62 100 76 100 71 100 68 100 65 100 65 Remarks: ......