Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Gibbs Station 1-LR 921019
ALPHA TESTING, INC. 2209 wisconsin st., Suite 100 Dallas, Texas 75229 (214) 620-8911 OF REID COMPACTION TESTS TESTEC) FOR: HEATH & KNTGHT PROPERT]:ES, ]:NC. DATE: DALLAS, TEXAS 10/19/92 PROJECT: GZBBS STAT]:ON LiM(ES OF COPPELL COPPELL, TEXAS OUR REPORT NO. -92020-91 TEST DATA: LC) [ MmSTUBC ~V OINSlTY UOIITUOI JlY BINmTY pKO CCNT COMMENT* ;OS_ ATE .]rJ~H _-- ~1 ~ PCP ~ PCP COMPACTION 586 10/19 F~ 8 26.8 ~ .8 28.6 ~ 98 1-A 587 10/19 FSG 8 26.8 88.8 30.7 85 97 1-A 588 10/19 SG 8 26.8 88.8 26.5 94 107 1-BC 589 10/19 SG 8 26 . 8 88 . 8 27 . 5 91 104 1-BC TEST LOCATION: BUILDING PAD i586 BLOCK D LOT 15 587 .BLOCK D LOT 17 588 BLOCK D LOT 13 589 BLOCK D LOT 10 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST