Gibbs Station 2-LR 931028 (05) ALPHA TESTING, INC. REPORT OF CONCRETE
22o9 wisco, s,n st COMPRESSION TEST
Suite 100
Dallas. Texas 75229
-/ (214) 620-8911
TESTEDFOR GIBBS STATION, LTD DATE: 10/28/93
C/O HEATH & KNIGHT PROPERTIES
DALLAS, TEXAS
PROJECT GIBBS STATION OURREPORTNO. 93384--44
PHASE
COPPELL, TEXAS
FIE LD DATA
LOCATION OF CONCRETE PLACEMENT GIBBS CROSSING
5TA. 18+00 CENTER LINE
DATE PLACED 10/28/93 PLANT ON SITE
TIME 5: 1 S DELIVER TICKET NO. N/A
SLUMP 2" MIX PROPORTIONS (SSO) N/A
AIR CONTENT ,5.4 CEMENT N/A
AIR TEMPERATURE 81_ WATER N/A
CONCRETE TEMPERATURE 79 FINE AGGREGATE N/A
DATE RECEIVED 10/30/93 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY DW ADMIXTURE N/A
MIX DATA SUBMIT'TED BY EH LACY
REMARKS
COMPRESSION TEST RESULTS ·
INOMINAL CYLINDER SIZE 6" X 12"I :~"~ Cylinders made by ALPHA
representative.
Lab. Customer ~ Type Date Coml3rwive ~ Cylinders made by Architect's
No. i No. i Curing Te~ted Strength,
Contractor's
or
representative.
! i i 'r-~Cylinders picked up by ALPHA
41 ~-'~3384 I LAB 11/04/93:
laboratory.
42 93384 :. LAB 11/25/93 28 F~ Cylinders delivered to ALPHA
laboratory.
4 3 q~3F~4 LAB 11/25/93 "- ~ ' ~] Compression test results comply with
i applicable specifications.
44 93384 LA~ HOLD ,~ Compression test results do no~ comply
with applicable specifications.
Isp.; ' .:a'.c~s 3600
TYPE OF FRACTURE. IF OTHER
T. HAN CONICAL