Loading...
Gibbs Station 2-LR 931028 (07) ALPHA TESTING, INC. REPORT OF CONCRETE 2209 W,scons,n St. COMPRESSIONTEST Suite 100 Dallas. Texas 75229 (214) 620-8911 TESTEDFOR GIBBS STATION, LTD DATE. 10/28/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT GIBBS STATION OURREPORTNO. 93384--43 PHASE II COPPELL, TEXAS FIELD DATA LOCATION OF CONCRETE PLACEMENT GIBBS CROSSING STA. 15+00 CENTER LINE DATE PLACED 10/28/93 PLANT ON SITE 4: 05 DELIVER TICKET NO. TIME SLUMP 2" MIX PROPORTIONS (SSD) AIR CONTENT 5 . 4 CEMENT Am TEMPERATURE 82 WATER CONCRETE TEMPERATURE 79 FINE AGGREGATE DATE RECEIVED 1_0/30/93 COARSE AGGREGATE FIELD DATA SUBMITTED BY DW ADMIXTURE N/A MIX DATA SUBMITTED BY LH LACY REMARKS COMPRESSION TEST RESULTS __..~- NOMINAL CYLINDER SIZE 6" X 12") L~ Cyfinders made by ALPHA representative. Lab. Customer Type I Date D~i Comprmwe ~.' Cylinders made by Architect's . No. No. Curir~ i Te~ed St~en~h, Pmi or Contractor's representative. : ~"~Cylinders picked up by ALPHA 37 ~2.384 [_AB i 11/04/93 12 3820 laboratory. 38 93384 LAB i 1/25/93 28 F.,' Cylinders delivered to ALPHA laboratory. :?:4 '~:3384 LAB ]. 1/25/93 28 ~, Compression test results comply with applicable specifications. 40 9'3384 [._AB HOLD -- L.~ CompreSSion lest results do nol comply with applicable specifications. TYPE OF FRACTURE, IF OTHER THAN CONICAL R,.~ect fully Submitted - ....f..~, f ! I,*~-..- I ~-~ £~'