Gibbs Station 2-LR 931028 (10) ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wiscons,n St. COMPRESSIONTEST
Sumte 100
Dallas. Texas 75229
· / (214) 620-8911
TESTEDFOR GIBBS STATION, LTD DATE' 10/28/93
C/O HEATH & KNIGHT PROPERTIES
DALLAS, TEXAS
PROJECT GIBBS STATION OURREPORTNO. 93384--41
PHASE II
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT GIBBS CROSSING
STA. ':~.2'5 CENIER LINE'
DATE PLACED 10/28/93 PLANT ON SITE
TIME ] 2: 3.~ DELIVER TICKET NO. N/A
SLUMP ~- . r~., ,. MIX PROPORTIONS (SSD) N/A
AIR CONTENT -~:' - ~' CEMENT N/A
AIR TEMPERATURE 7 .~ WATER N/A
CONCRETE TEMPERATURE 72 FINE AGGREGATE N/A
DATE RECEIVED 10/30/<~3 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY ~W ADMIXTURE N/A
MIX DATA SUBMITTED BY LH LACY
REMARKS
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6- X 12"! ~'f'.-' Cylinders made by ALPHA
representative.
Lab. Customer Type Dete i ~l Compre.m, lve __ Cylinders made by Architect's
No. No. ; Curing i T~ed I DIyI Stren~h. P=i or ~ntractor's representative.
~nders picked up by ALPHA
la~rato~.
apphcable sp~ifications.
with applicable s~fications.
T~E. IF ~HER