Loading...
Gibbs Station 2-LR 931012 (2) ALPHA TESTING, INC. REPORT OF FIELD 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 COMPACTION TESTS (214) 620-8911 TESTEDFOR GIBBS STATION, LTD DATE: 10/12/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT GIBBS STATION OURRE~RTNO. 93384-34 PHASE II COPPELL, TEXAS TEST DATA: TEST DATE IO1~ iD OPTIMUM PIN CiNT NO N~alIa M~IIT~NI ~i1 ~INIITY MOIIT~Ni ~NY ~INIITY COMMENTe 87 10/12 FG 1L 18.6 102.8 19.2 103 101 3-~ i ;88 10/12 FG 2L 33.7 84.0 34.2 81 97 3-~ TEST LOCATION: 87 STA. 1+00 ROUND ROCK 88 ROUND ROCK CENTER OF CUL DE SAC 1. FILL '~ A. TEST RESULTS COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEIViENT TREATED D. RETEST