Loading...
Gibbs Station 2-LR 931012 (3) ALPHA TESTING, t,,~C. MECHANICAL LIME 2209 Wisconsin St. Su.e ~00 STABILIZATION REPORT Dallas, Texas 75229 ~2~4) 620-89~ FINAL MIX TESTED FOR GIBBS STATION, LTD. DATE iO/12/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS GIBBS STATION PHASE I I PROJECT COPPELL, TEXAS OUR REPORT NO. 93384-34A ALLEYS Area of Work: Date lime initially applied 10/08/93 Average final compacted depth: E, inches. Date of final mixing 3-0/3-2/c)3 TEST DATA ~ Passing ~ Passing SampleLocation 1 3/4" Sieve #4 Sieve ALLEY "8" ~ STA. 1+OO 100 81 ALLEY "B" ~ STA. 4+00 100 74 ALLEY "B" @ STA. 7+00 100 72 ALLEY "B" ~ STA. [0+00 100 84 Remarks: