Gibbs Station 1-LR 920916 (2)ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
DAILY FIELD REPORT
TESTED FOR
HEATH & KNIGHT PROPERTIES, I~C. DATE
DN_LAS, TEXAS
09/16/92
PROJECT
GIBBS STATION
LAKES OF COPPELL
COPPELL, TEXAS
OUR REPORT NO. 92020-48
WEATHER: PARTLY CLOUDY
TEMPERATURE RANGE: BO
ALPHA Repreleflta#ve: O. M.
DATE: 09/16/92
TO: 88
THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED BY THE
CLIENT TO PERFORM FIELD DENSITY TESTING.
A TOTAL OF SEVEN FIELD DENSITY TESTS WERE PERFORMED ON FILL SOILS FOR
THE BUILDING PADS. SEE ATTACHED REPORT OF FIELD COMPACTION TESTS.
THE GREGORY REPRESENTATIVE WAS INFORMED OF TEST RESULTS WHICH ~PPE~J~ED TO
COMPLY WITH PROJECT SPECIFICATIONS.
IN ADDITION, THE TECHNICIAN OBSERVED THE PROOFROLLING OF BUILDING PADS
NUMBERED 12, 13, 14, 1S, ~ND 16 OF BLOCK "D', AND THE ALLEY NORTH OF THE
NOTED BUILDING PADS. PROOFROLLING WAS PERFORMED USING A MOTOR GRADER.
DURING PROOFROLLING, NO WEAK AREAS WERE IDENTIFIED. FIELD DENSITY TESTS
WILL BE PERFORMED ON THIS DATE LATER IN THE AFTERNOON.
TECHNICIAN RETURNED TO THE LABORATORY UPON COMPLETION OF SCHEDULED TESTING.