Loading...
Gibbs Station 1-LR 920911ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEOFOR: HEATH & KNIGHT PROPERTIES, INC. DATE: DALLAS, TEXAS 09/11/92 PROJECT: GIBBS STATION LAKES OF COPPELL COPPELL, TEXAS OUR REPORT NO. 92020-43 TEST DATA: TEST DATE [~ ~LEV. lOlL IO OPTIMUM MAXIMUM LAI IN PLACE IN PLACE ~ MOIiTUNi ONY OENIITY MOIITUEI BEY OINIITY PiN CENT COMMENT· NO, ~, .,, _ NUMBER_ , ~ PCP ~ PCP COMPACTION 369 09/11 FG-4 7 15.5 109.4 19.5 103 95 370 09/11 FG-4 7 15.5 109.4 19.2 104 95 i-A 371 09/11 FG-4 2 18.2 103.8 19.5 102 98 i-A i372 09/11 FG-2 2 18.2 103.8 20.8 102 98 1-A 373 09/11 FG-2 7 15.5 109.4 16.2 106 97 1-A 374 09/11 FG ? 15.5 109.4 18.9 105 96 1-A 375 09/ii FG 7 15.5 109.4 15.7 106 97 1-A TEST LOCATION: UTILITY TESTS 369 SANITARY SEWER LINE D LATERAL TO BLOCK G LOT 1S 370 SANITARY SEWER LINE D LATERAL TO 8LOCK G LOT i3 371 SANITARY SEWER LINE D LATERAL TO 8LOCK G LOT ii 372 SANITARY SEWER LINE O LATERAL TO BLOCK G LOT 12 373 SANITARY SEWER LINE D LATERAL TO BLOCK G LOT 14 374 SANITARY SEWER LINE D LATERAL TO 8LOCK G LOT 12 375 SANITARY SEWER LINE D LATERAL TO 8LOCK G LOT 14 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST