Loading...
Gibbs Station 1-LR 920818ALPHA TESTING, IHC. 2209 Wisconsin St.. Suite 100 Dallas, Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR HEATH & KNIGHT PROPERTIES, INC. OATE DALLAS, TEXAS O8/18/92 PROJECT GIBBS STATION LAKES OF COPPELL CO,ELL, TEXAS OUR REPORT NO. 92020--25 WEATHER: PARTLY CLOUDY DATE: TEMPERATURE RANGE: 78 TO: ALPHA Representative: D. M. 9O 08/18/92 THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED BY THE CLIENT TO PERFORM FIELD DENSITY TESTING. AFTER EXCAVATION, THE TECHNICIAN OBSERVED THE PROOFROLLING OF THE WESTERN HALF OF LOTS l, 2, 3, AND 4 OF 8LOCK D, 8LOCK E LOT i6, AND BURNS ROAD CROSSING. THE AREA WAS SCARIFIED, RECOMPACTED, AND TESTED PRIOR TO PROOFROLLING- PROOFROLLING WAS ACCOMPLISHED USING A MOTOR GRADER. NO SOFT OR WEAK AREAS WERE 08SERVED. A TOTAL OF FIVE FIELD DENSITY TESTS WERE PERFORMED ON FILL SOILS FOR THE BUILDING PADS. SEE ATTACHED REPORT OF FIELD COMPACTION TESTS. THE GREGORY REPRESENTATIVE WAS INFORMED OF TEST RESULTS WHICH APPEARED TO COMPLY WITH PROJECT SPECIFICATIONS. TECHNICIAN RETURNED TO THE LABORATORY UPON COMPLETION OF SCHEDULED TESTING.