Gibbs Station 1-LR 920729ALPHA TESTING, INc.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
REPOFIT OF FIELD
COMPACTION TESTS
TESTEOFOR: HEATH & KNIGHT PROPERTIES, INC. DATE: 07/29/92
DALLAS, TEXAS
PROJECT: GIBBS STATION OURRI~TNO. 92020-18
LAKES OF COPPELL
COPPELL, TEXAS
TEST DATA:
TEST DATE ~NV0 lOlL IR OPTIMUM MAXIMUM GA1 IN ,~¢C I# P~ACl
NO. NUMBER MOIITUNI DRY DENSITY MOIITUNI DaY DENIITY ,Ri CINT COMMENT*
194 07/29 SG 11 11.8 121.0 12.3 115 95 2-A
195 07/29 SG 11 11.8 121.0 12.1 115 95 2-A
196 07/29 SG 11 11.8 121.0 12.1 115 96 2-A
197 07/29 SG 11 11.8 121.0 11.8 118 97 2-A
198 07/29 SG 11 11.8 121.0 11.8 118 97 2-A
199 07/29 SG 11 11.8 121.0 12.1 116 96 2-A
200 07/29 FG 8 26.8 88.0 28.9 83 94 1-A
TEST LOCATION: BUILDING PAD
194 BLOCK 8 LOT 18 PHASE II
195 BLOCK B LOT 20 PHASE II
196 8LOCK 8 LOT 22 PHASE II
197 8LOCK 8 LOT 24 PHASE II
198 8LOCK 8 LOT 26 PHASE II
199 8LOCK 8 LOT 28 PHASE II
200 BLOCK 8 LOT 28 PHASE II
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4.
A. TEST RESULTS COMPLY WITH SPECIFICATIONS
B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
· D. RETEST