Loading...
Gibbs Station 1-LR 920617 (2)ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REP t'I' OF FIELD COMPACTION TESTS TESTED FOR: HEATH & KNIGHT PROPERTIES, INC. DATE: DALLAS, TEXAS 06/17/92 PROJECT: GIBBS STATION LAKES OF COPPELL COPPELL, TEXAS OUR REPORT NO. 92020-9 (REVISED 7/8/92) TEST DATA: TEST DATE [~ ELIV. I .OILIO I OP?I#U# I~1~_~,NP¼SI ,NPLA¢! ~_ MOIITURE MOIITUEE DNY DENSITY PEK SENT COMMENT· NO. ~EPT# .u.... I · ..... . Pc. GOM'AST.O. 42 06/17 FG 8 26.8 88.0 28.8 84 96 1-A 43 06/17 FG-1 3 22.6 92.2 26.6 89 97 1-A -44 06/17 FG-1.5 3 22.6 92.2 26.5 90 98 1-A 45 06/17 FG-1 2 18.2 103.8 19.1 99 95 1-A 46 06/17 FG-1 2 18.2 103.8 21.5 101 97 1-A 47 06/17 FG-1.5 3 22.6 92.2 26.9 90 97 1-A 48 06/17 FG-.5 8 26.8 8B.O 30.0 89 96 1-A TEST LOCATION: BUILDING PAD 42 BLOCK C LOT 28 10~ S. & 18' E. FROM N.W. CORNER OF PAD 43 8LOCK C LOT 26 18' S. & 22' W. FROM N_E. CORNER OF PAD 44 BLOCK C LOT ? 12' S. & lO' E. FROM N.W. CORNER OF PAO 45 8LOCK C LOT 9 iS' S. & 6' E. FROM N.W. CORNER OF PAD 46 8LOCK C LOT ii i6' N. & 15' E. FROM S.W. CORNER OF PAD 47 8LOCK C LOT i3 20' N. & 20' E. FROM S.W. CORNER OF PAD 48 BLOCK E LOT 13 22~ N. & iS' E. FROM S.W. CORNER OF PAD 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST