Loading...
Gibbs Station 1-CS 920730~ The City With A Beautiful Future July 30, 1992 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Sam Wise Heath & Knight 1660 Dallas Parkway, Suite 1400 Dallas, TX 75248 Gibbs Station - Phase I Development Fee Assessment Dear Mr. Wise: Enclosed is a copy of the City of Coppell Development Fee Assessment list dated 7/30/92, along with a copy of the development fee calculations for Gibbs Station Phase I, dated 7/29/92. Please provide a check made payable to the City of Coppell in the amount of $106,615.97 and forward it to Mr. Alan Johnson, Finance Department, along with a copy of the fee assessment list. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questiOns, please do not hesitate to contact M. Shohre Daneshmand, P.E. or myself. Sincerely, City Engineer KMG/MSD/bd cc; Steve Goram,Director of Public Works Alan Johnson, Assistant Finance Director Greg Jones, Acting Building Official Gary L. Sieb, Director of Planning and Community Services Larry Davis, Construction Inspector M. Shohre Daneshmand, P.E., Civil Engineer Bill Anderson, P.E., Dan M. Dowdey & Associates CITY OF COPPELL DEVELOPMENT FEES Date: Project: July 30, 1992 Gibbs Station Phase I (97 Residential Lots) TOTAL ASSESSMENT AMOUNT DUE PRIOR 8/14/92 Park Fee (50% payable prior to Council Approval) (50% payable with Building Permit) $ 14,550.00 $ 7,275.00 Water Impact Fee (100% due prior to Council Approval) $ 63,050.00 $ 63,050.00 Water Tap Inspection Fee (100% due at Issuance of Building Permit) $ 9,700.00 Wastewater Impact Fee (100% due prior to Council Approval) $ 21,825.00 $ 21,825.00 Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Street Sign Fee (100% due prior to Council Approval) $ 9,700.00 $ 1,954.71 $ -0- $ 1,954.71 Street Light Fee (100% due prior to Council Approval) Construction Inspection Fee (2% of Construction Cost in the amount of $625,562.80 provided by developer Heath & Knight Properties.) $ 12,511.26 $ 12,511.26 TOTAL $133,290.97 $106,615.97 TOTAL AMOUNT DUE PRIOR TO AUGUST 14, 1992 $106,615.97 *This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $296.60 per light will be assessed. COPPELL PUBLIC WORK~ MEMORANDUM July 29, 1992 Shohre Daneshmand, Ci~i~ Engineer Public Works Staff ~, Development Fees for ~~ ~\~\~ The following fees should be assessed on the above referenced project. Water Impact Fee: 97 - 5/8" x 3/4" Domestic Meter/s = - Irrigation Meter/s = - Fireline Meter/s = 97 ESU' s ESU' s ESU' s Total 97 ESU's ~ $650.00 ea = $63,050.00 100% due prior to Council approval of final plat. * This calculation does not include irrigation services. City Wastewater Impact Fee: 97 - 5/8" x 3/4" Domestic Meter/s = 97 ESU's ~ $225. O0 = $21,825. O0 100% due prior to Council approval of final plat. Water Tap Inspection Fee 97 Connections @ $100.00 each = $9,700.00 100% due pri-or to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 97 Connections @ $100. O0 each = $9,700. O0 100% due prior to issuance of building permit. Street L£ghting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 97 Residential Lots at $150.00 each = $14,550.00 .Nm Units (Multi family) at $75.00 each = $ N/A 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram, Director of Public Works GIBBSS TA. HL P STREET SIGN ASSESSMENT for Gibbs Station The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. EXTENDED PRICE SIGN UNIT PRICE QUANTITY No Parking $ 53.10 Speed Limit $ 63.54 19 $1,207.26 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 2 23.20 Stop & Street Combo $ 96.85 7 $ 677.95 OTHER Poles 23.15 2 46.30 TOTAL $1,954.71 * Cost breakdowns may be obtained from Public Works by written request.