PRE-CONSTRUCTION PACKET
P,O. Box 478
Coppell, Texas 75019
214 - 462 - OO22
NAME: COMPANY: PHONE:
(1)
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
ASSIGNED INSPECTOR:
AttENDANCE:
III.
IV.
Vo
PLANS FURNISHED TO:
(See Attached List )
A) CITY
B ) CONTRACTOR
C) OWNER
UTILITY COMPANIES NOTIFIED:
A) TR3.RPHONE
B) GAS
C ) w.~ ,VL-~I~R I C
D) CABLE T.V.
E) OTHER
STATUS OF RIGHT-OF-WAY AND/OR LAND ~S:
EASEMENTS YES
HIGHWAY PERMIT YES
RAILROAD PERMIT YES
STREET CUT PERMIT YES
BORING PERMIT YES
INSPECTION:
A. DAILY INSPECTION BY ASSIGNED INSPECTOR
AFTER HOURS AND WEEKENDS (OVERTIME) TO
BE PAID BY THE CONTRACTOR "AT OVERTIME
RATES".
Ce
CONTRACTOR ANDSUB-CONTRACTORS TO NOTIFY
INSPECTOR AT LEAST TWENTY-FOUR (24) HOURS
BEFORE WATER/SANITARY S~_~/STORM S~R/
PAVING CONSTRUCTION BEGINS.
YES NO
(2)
VI.
TESTING OF MATERIALS:
1. DENSITIES
2. .APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII.
STREET CLOSING REQUIRED: YES __
IF'YES, CON~I~J~CTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-T~O (72) HOURS IN
ADVANCE.
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED
B. TRAFFIC DETOUR
C. WARNING LIGHTS
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
INFORMATION:
DEVELOPER:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER:
(3)
GENERAL CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
EXCAVATING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
PAVING CONTRACTOR:
ADDRESS:
PHONE:
SUPERINTENDENT:
AS-BUILT DRAWINGS - UTILITIES
1 - MYLAR 3 - BLUE LINES
DATE
AS-BUILT DRAWINGS - PAVING, DRAINAGE
1 - PrfLAR 3 - BLUE LINES
MAINTENANCE BOND - UTILITIES
PRO-RATA WORK SHEET COMPLETED/
STREET ASSESSMENTS
WATER ANDSEWERFINALED
PAVING AND DRAINAGE FINALF. D
DEVELOPMENT INSPECTION FEE:
(4)
LETI~ER OF ACCEPTANCE WRI~A~EN
DATE:
LETI~R OF ACCEPTANCE WILL
THE WALK-THROUGH HAS BEEN
DEPARTMENTS.
THIS INCLUDES SUBMITTING:
NOT BE WRITI~EN UNTIL THE PUNCH LIST MADE FROM
COMPLETED AND RE-INSPECTED BY THE RESPECTIVE
AS-BUILTS, BONDS, AND
PAYING PRO-RATA.
PRE-CONSTRUCTION NOTES
DEFICIENT PAVEMENT, STRENGTH, THICKNESS
SCREEN WALL.
DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER
TO THE CITY OF COPPEr,r, ENGINEERING DEPARTMENT.
CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL
REPORTS ARE RECEIVED.
COR-TEN BOLTS IN FI~INGS.
FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER.
STEPS IN MANHOLES.
WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL.
4' BURY ON HYDRANTS.
FORD DOUBLE CHECK ~TER LOOP (SEE CITY SPECIFICATIONS).
COLOR CODE HYDRANTS, TOP BONNET AND CAPS.
CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE
ENGINF. F, RING DEPARTMENT.
TEMPORARY SANITARY FACILILTIES.
CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS).
LANDSCAPE CO~IITTMENT.
LANDSCAPE MAINTENANCE AGRF. RMENT.
PRE. CNSTRCTN.
PZAGN
(5)