Gibbs Station 1-CS 930128COPPELL PUBLIC WO~ January 28, 1993 JAN 2 8 Larry Davis, Construciton Inspector Howard L. Pafford, Utilities Superintendent Walk Through at Gibbs Station Phase I (Water/ Sanitary Sewer) Field personnel conducted a walk through at the above referenced project this morning. The following are items found to be deficients 1. Lot 8 Block E 2. Lot 6/7 Block E 3. Lot 32 Block F 4. Lot 3/4 Block C 5. Lot 5 Block C 6. Lot 4 Block C 7. Lot 22 Block F 8. Lot 21 Block F 9. Lot 6 Block F 10. LOt 12 Block G 11. Lot 2 Block F 12. 13. 14. Lot 10/11 Block F Lot clean out needs adjusted to fit C/T adapter. Chimney seal not in properly. Meter setter too high. Existing manhole reset rings and grout. Clean out needs plug. Main line valve - cannot locate. Replace meter can. Chimney seal adjusted to seal to ring. Lot clean out needs pad. Reset lot clean out and repour pad. Need pad on clean out and meter setter leaking. Main line clean outs need plug. Manhole at Village Parkway and Burns Crossing needs chimney seal and top half of pipe cut out in invert. Lot i Block C Uncover valves at hydrant & make sure 15. Lot 6 on Village Pkwy. 16. Lots 1-5 Block G 17. Lot 16 Block C 18. Lot 22/23 Block F pads are there. Uncover valves at hydrant & make sure pads are there. Need to check lateral clean out. Ring needs reset & grouted. Fire hydrant needs a new 2½" ear. HLP/dm GIBBSTA.HLP