Gibbs Station 1-CS 930128 (2)COPPELLPUBLICWORKS
January 28, 1993
Larry Davis, Construction Inspector ~]~/ -
.ow r
Walk Through at Gibbs Station Phase I
(Water/Sanitary Sewer)
Field personnel performed a final punch list walk through on the
above referenced project this afternoon and found that all
deficiencies had been corrected.
Please ensure that maintenance bonds and project as-builts are
sent to Public Works prior to acceptance of this project.
If you have any questions, please advise.
HLP/dm
cc=
Steven G. Goram
Director of Public Works
GIBSPHSE.HLP