Gibbs Station 1-CS 930201TO:
City of Coppell
Engineering Department
February 1, 1993
FROM: Gibbs Station, Ltd.
RE: Deposit for Erosion Control Maintenance
Enclosed please find our check in the amount of $14,700
which represents a deposit to the City of Coppell for the
amount of our Contract for erosion control at Gibbs Station.
A copy of this Contract is also enclosed.
16660 Dallas Parkwa_~
Suite 1400
Dallas, Texas 75248
Phone: 214-248-919(
FAX: 214~248-9196
GIBBS STATION, LTD.
16660 N. DALLAS pI<Y. STE 1400 PH 214 248, 91.'90
DALLAS, TEXAS 75248
,,.. . ....
·
'""""7 M ¥ ,."t~.,/~__;'
,' Z~?&/?
H, O0 ]. ~ ),q~l' I'' ' ~mnnq? :[~''
MEMORANDUM
February 1, 1993
P.O. Box 478
Coppelt, Texas 75019
214-4§2-0022
Mr. Bill Anderson
Dan M. Dowdey & Associates
16250 Dallas Parkway, Suite 100
Dallas, TX 75248-2684
Re: Gibbs Station Phase I
Final Acceptance
Dear Mr. Anderson:
A final inspection of the above-referenced project has been confirmed by representatives of the
City of Coppell subject to the various maintenance agreements.
The drainage utility and paving has been verified and is in compliance with the City of Coppell
standard requirements. Erosion protection will also be maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be one year from the date of this letter. Maturity on the Erosion
Control Bond will be two years from this letter.
Sincerely,
Construction Inspector
CC:
Steve Goram, Director of Public Works
Kenneth M. Griffin, P.E., City Engineer
M. Shohre Daneshmand, Civil Engineer
Greg Jones, Acting Building Official
Chuck Young, C. W. Young Construction Co.
Bill Jones, L. H. Lacy