Loading...
Gibbs Station 2-LR 930825 ALPHA TESTING, IN(- REPOF OF FIELD 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 COMPACTION TESTS (214) 620-8911 TESTED FOR' GIBBS STATION, LTD DATE: 08/25/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT: GIBBS STATION ~RRE~RTNO. 93384--11 PHASE II COPPELL, TEXAS TEST DATA: TEST , DATE El. Er. 8OiL mO OPTmMUu NO ; NUldllll MOIITURE ONY pD:FNelTT MOIITUOE BEY OENIITY PER CENT COMMENTe i ~ ..... ~& , ~ pCiB' COMPACTION $2 i 08/25 FG-2.$ 7 15.5 10c).4 15.c) 109 100 53 I 08/25 FG-2.5 7 15.5 109.4 16.9 108 98 1-A I 54 08/25 FG-2.5 7 15.5 109.4 17.0 108 99 i-A 55 08/25 FG-2.5 7 15.5 109.4 17.2 105 96 1-A 'EST LOCATION: 52 SANITARY SEWER LATERAL BACKFILL BLOCK A LOT i8 (LINE 53 SANITARY SEWER LATERAL BACKFILL BLOCK A LOT i2 (LINE 54 SANITARY SEWER LATERAL BACKFILL BLOCK A LOT 8 (LINE 'A') 55 SANITARY SEWER LATERAL BACKFILL BLOCK A LOT 5 (LINE · FILL ° A. TEST RESULTS COMPLY WITH SPECIFICATIONS Reslx. C~l¥ Submitted~ _ ~" · HATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS · LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS CEMENT TREATED D. RETEST