Gibbs Station 2-LR 930825 ALPHA TESTING, IN(- REPOF OF FIELD
2209 Wisconsin St., Suite 100
Dallas, Texas 75229 COMPACTION TESTS
(214) 620-8911
TESTED FOR' GIBBS STATION, LTD DATE: 08/25/93
C/O HEATH & KNIGHT PROPERTIES
DALLAS, TEXAS
PROJECT: GIBBS STATION ~RRE~RTNO. 93384--11
PHASE II
COPPELL, TEXAS
TEST DATA:
TEST , DATE El. Er. 8OiL mO OPTmMUu
NO ; NUldllll MOIITURE ONY pD:FNelTT MOIITUOE BEY OENIITY PER CENT COMMENTe i
~ ..... ~& , ~ pCiB' COMPACTION
$2 i 08/25 FG-2.$ 7 15.5 10c).4 15.c) 109 100
53 I 08/25 FG-2.5 7 15.5 109.4 16.9 108 98 1-A
I
54 08/25 FG-2.5 7 15.5 109.4 17.0 108 99 i-A
55 08/25 FG-2.5 7 15.5 109.4 17.2 105 96 1-A
'EST LOCATION:
52 SANITARY SEWER LATERAL BACKFILL BLOCK A LOT i8 (LINE
53 SANITARY SEWER LATERAL BACKFILL BLOCK A LOT i2 (LINE
54 SANITARY SEWER LATERAL BACKFILL BLOCK A LOT 8 (LINE 'A')
55 SANITARY SEWER LATERAL BACKFILL BLOCK A LOT 5 (LINE
· FILL ° A. TEST RESULTS COMPLY WITH SPECIFICATIONS Reslx. C~l¥ Submitted~ _ ~"
· HATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
· LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
CEMENT TREATED D. RETEST