Loading...
Gibbs Station 2-LR 930823 ALP,^ ,NC. REPORT OF FIELD 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 COMPACTION TESTS (214) 620-8911 TESTEDFOR: GIBBS STATION, LTD DATE: 08/23/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT. GIBBS STATION OURRE~RTNO. 93384--7 PHASE II COPPELL, TEXAS TEST DATA: i TEST DATE ~LI¥. mOlL I0 OPTIMUM MAXIMUM LAD IN PLACE IN PLACE NO rJEPTH ~ NUMBEE ~ PCP ~ PCP COMPACTION 122 08/23 FG-3 2 18.2 103.8 19.1 100 96 1-A i ' 23 08/23 FG-1 2 18.2 103.8 19.2 100 96 1-A I i24 08/23 FG-3 17 22.3 95.9 22.4 93 97 1-A !25 08/23 FG-1 17 22.3 95.9 23.4 92 96 1-A 26 08/23 FG-3 2 i8.2 103.8 19.0 102 98 1-A 27 08/23 FG-1 2 18.2 103.8 18.3 102 98 1-A 28 08/23 FG-3 2 18.2 103.8 20.0 103 99 1-A TESTLOCATION: 22 8' WATER LINE BACKFILL 0 BLOCK E LOT 41 (GIBBS CROSSING) 23 8' WATER LINE BACKFILL 0 BLOCK E LOT 41 (GIBBS CROSSING) 24 8' WATER LINE BACKFILL 8 BLOCK E LOT 37 (GIBBS CROSSING) 25 8' WATER LINE BACKFILL 8 BLOCK E LOT 37 (GIBBS CROSSING) 26 8' WATER LINE BACKFILL 8 BLOCK E LOT 31 (CREEK CROSSING) 27 8" WATER LINE BACKFILL 8 BLOCK E LOT 31 (CREEK CROSSING) 28 8" WATER LINE BACKFILL 0 BLOCK D LOT 32 (CREEK CROSSING) 1. FILL " A. TEST RESULTS COMPLY WITH SPECIFICATIONS ~,,~Res , ~ ......... 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ~~-~--~ 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST