Loading...
Gibbs Station 2-LR 930823 (2) ALPHA TESTING, INC. REPORT OF FIELD 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 COMPACTION TESTS (214) 620-8911 TESTEDFOR: GIBBS STATION, LTD DATE: 08/23/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT: GIBBS STATION OURRE~RTNO. 93384-7A PHASE II COPPELL, TEXAS TEST DATA: --'- ! ~ _ _.. OPTIMUM MAXIMUM LAB IN PLACE iN PLACE TEST I DATE rlE~ Io1~ ID PER CENT MOISTURE DRY D~NIITY MOIITUEi DRY DKNIITY COMMENTe : ~ PCP COMPACTION 29 ;08/23 FG-1 2 18.2 103.8 18.8 104 100 1-g 30 108/23 FG-3 2 18.2 103.8 18.5 102 98 1-A I 31 [08/23 Fa-1 2 18.2 103.8 19.8 102 98 1-A 32 I 08/23 FG-3 2 18.2 103.8 19.5 101 97 1-A 33 08/23 FG-! 2 18.2 103.8 18.9 102 98 i-A 34 08/23 FG-3 2 18.2 103.8 19.3 101 97 1-A 35 08/23 FG-1 2 18.2 103.8 19.4 99 95 1-A rESTLOCATION: 29 8" WATER LINE BACKFILL 0 BLOCK D LOT 32 (CREEK CROSSING) 30 8" WATER LINE BACKFILL 0 8LOCK D LOT 34 (CREEK CROSSING) 31 8" WATER LINE BACKFILL ~ BLOCK D LOT 34 (CREEK CROSSING) 32 8" WATER LINE BACKFILL ~ BLOCK D LOT 37 (CREEK CROSSING) 33 ~ 8" WATER LINE BACKFILL 8 BLOCK D LOT 37 (CREEK CROSSING) 34 8" WATER LINE BACKFILL ~ BLOCK D LOT 41 (CREEK CROSSING) 35 8" WATER LINE BACKFILL 0 BLOCK D LOT 41 (CREEK CROSSING) 1. FILL ° A. TEST RESULTS COMPLY WITH SPECIFICATIONS Respecff~ ~ ......... 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ~ ~VA TE~/~~ 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS A ~.t. , 4. CEMENT TREATED D. RETEST