Loading...
Gibbs Station 2-LR 930820 (3) ALPHA TESTING, INC. REPORT OF FIELD 2209 Wisconsin St., Suite 100 COMPACTION TESTS Dallas. Texas 75229 (214) 620-8911 T[STEDFOR: GIBBS STATION, LTD DATE: 08/20/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT GIBBS STATION OURRE~R?NO. 93384-$A PHASE II COPPELL, TEXAS TEST DATA: TEST ;, DATF- lOlL In OPTIMUM MAXIMUM LAB IN PLACI IN PLACE MOIITUll OEY OINIITY MOIITUll I)IY GINIITY Pill CENT COMM[NTe NO I NUMIEII ~k PGF ~ PCF COMPACTION TEST LOCATION: 15 8" SANITARY SEWER LINE "A" ~ STA. 5+50 1. FILL " A. TEST RESULTS COMPLY WITH SPECIFICATIONS R~~ __-~~'~' 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST