Loading...
Gibbs Station 2-LR 930819 (2) ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St. COMPRESSIONTEST Suite 100 Dallas. Texas 75229 /' (214) 620-8911 TESTEOFOR GIBBS STATION, LTD DATE: 08/19/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT GIBBS STATION OURREPORTNO. 93384--14 PHASE II COPPELL, TEXAS FIELD DATA 8" SANITARY SEWER LINE "A" LOCATION OF CONCRETE PLACEMENT STA. 3+,51 HANHOLE 08/19/93 N/A DATE PLACED PLANT TIME N/A DELIVER TICKET NO. N/A SLUMP N/A MIX PROPORTIONS (SSO) N/A AIR CONTENT N/A CEMENT N/A Am TEMPERATURE N/A WATER N/A CONCRETE TEMPERATURE N/A FINE AGGREGATE N/A DATE RECEIVED 08/26/93 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY CLIENT ADMIXTURE N/A MIX DATA SUBMI]-rED BY REMARKS COMPRESSION TEST RESULTS INOMINAL CYLINDER SIZE 6" X 12") ~ Cylinders made by ALPHA representative. Lab. Cultomlr Type Date ~ ! Comprlalive u Cylinders made by Architect's No. No, Curing [ Teated Days ! Strength, Psi or Contractor's representative. i I ~Cylinders picked up by ALPHA !! 93384 LAB j 08/27/93 io J 4440 laboratory. :. 12 93384 LAB" 09/16/93 28 [] Cylinders delivered to ALPHA laboratory. ~ 13 93384 LAB 09/16/93 28i [] Compression test results comply with applicable specifications. I i [] Compression test results do not comply I with applicable specifications. i CLIENT MADE Isp.c.~.ca'..o-s 28 4200 TYPE OF FRACTURE, IF OTHER  CONICAL fully Submitted