Loading...
Gibbs Station 2-LR 930818 ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wisconsin St. COMPRESSIONTEST Suite 100 Dallas, Texas 75229 (214) 620-8911 T£STEDFOR. GIBBS STATION, LTD DATE: 08/18/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT GIBBS STATION OURREPORTNO. 93384--16 PHASE II COPPELL, TEXAS FIELD DATA 8' SANITARY SEWER LINE 'A' LOCATION OF CONCRETE PLACEMENT STA. 0+69 MANHOLE 08/18/93 N/A DATE PLACED PLANT N/A DELIVER TICKET NO. N/A TIME SLUMP N/A MIX PROPORTIONS (SSD) N/A AIR CONTENT N/A CEMENT N/A AIR TEMPERATURE N/A WATER N/A CONCRETE TEMPERATURE N/A FINE AGGREGATE N/A DATE RECEIVED 08/30/93 COARSE AGGREGATE FIELD DATA SUBMITTED BY CLIENT ADMIXTURE MIX DATA SUBMITTED BY REMARKS COMPRESSION TEST RESULTS F~ Cylinders made by ALPHA (NOMINAL CYLINDER SIZE 6" X 12") u representative. · Lab. Cultomer Type Dltl ~ Compre~iv® E Cylinders made by Architect's ; No. No. Curing Teated Olys Strength, Psi or Contractor's representative. 14 93384 LAB 08/30/93 12 4200 ~CYlinders picked up by ALPHA laboratory. 15 93384 LAB 09/15/93 28 /~9_~0 [] cylinders delivered to ALPHA laboratory. 16 93384 LA8 09/15/93 28 4830 [~mpression test results comply with applicable specifications. [] Compression test results do ncX comply with applicable specifications. I CLIENT MADE Sp~c,,,ca:,o~s 28 4200 TYPE OF FRACTURE. IF OTHER