Gibbs Station 2-LR 930818 ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wisconsin St. COMPRESSIONTEST
Suite 100
Dallas, Texas 75229
(214) 620-8911
T£STEDFOR. GIBBS STATION, LTD DATE: 08/18/93
C/O HEATH & KNIGHT PROPERTIES
DALLAS, TEXAS
PROJECT GIBBS STATION OURREPORTNO. 93384--16
PHASE II
COPPELL, TEXAS
FIELD DATA
8' SANITARY SEWER LINE 'A'
LOCATION OF CONCRETE PLACEMENT
STA. 0+69 MANHOLE
08/18/93 N/A
DATE PLACED PLANT
N/A DELIVER TICKET NO. N/A
TIME
SLUMP N/A MIX PROPORTIONS (SSD) N/A
AIR CONTENT N/A CEMENT N/A
AIR TEMPERATURE N/A WATER N/A
CONCRETE TEMPERATURE N/A FINE AGGREGATE N/A
DATE RECEIVED 08/30/93 COARSE AGGREGATE
FIELD DATA SUBMITTED BY CLIENT ADMIXTURE
MIX DATA SUBMITTED BY
REMARKS
COMPRESSION TEST RESULTS
F~ Cylinders made by ALPHA
(NOMINAL CYLINDER SIZE 6" X 12") u
representative.
· Lab. Cultomer Type Dltl ~ Compre~iv® E Cylinders made by Architect's
; No. No. Curing Teated Olys Strength, Psi or Contractor's representative.
14 93384 LAB 08/30/93 12 4200 ~CYlinders picked up by ALPHA
laboratory.
15 93384 LAB 09/15/93 28 /~9_~0 [] cylinders delivered to ALPHA
laboratory.
16 93384 LA8 09/15/93 28 4830 [~mpression test results comply with
applicable specifications.
[] Compression test results do ncX comply
with applicable specifications.
I CLIENT MADE
Sp~c,,,ca:,o~s 28 4200
TYPE OF FRACTURE. IF OTHER