Gibbs Station 2-LR 930817 (2) ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wisconsin St. COMPRESSION TEST
Suite 100
Dallas, Texas 75229
/ (214) 620-8911
TESTEDFOR GIBBS STATION, LTD DATE: O8/17/93
C/O HEATH & KNIGHT PROPERTIES
DALLAS, TEXAS
PROJECT GIBBS STATION OURREPORTNO. 93384-13
PHASE II
COPPELL, TEXAS
FIELD DATA
8" SANITARY SEWER LINE "B"
LOCATION OF CONCRETE PLACEMENT
STA. 11+89 MANHOLE
08/i7/93 PLANT N/A
DATE PLACED
TIME N/A DELIVER TICKET NO. N/A
N/A MIX PROPORTIONS (SSD) N/A
SLUMP
N/A CEMENT N/A
AIR CONTENT
AIR TEMPERATURE N/A WATER N/A
CONCRETE TEMPERATURE N/A FINE AGGREGATE
DATE RECEIVED 08/26/93 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY CLIENT ADMIXTURE N/A
MIX DATA SUBMITTED BY
REMARKS
COMPRESSION TEST RESULTS
NOMINAL CYLINDER SIZE 6- X 12"} ~ Cylinders made by ALPHA
representative.
i I Data I ~ Compreaaiva ;-~ Cylinders made by Architect's
Lab. , Customer Type i Teated Days Strength, Psi
No. i No. Curin~ ) t or Contractor's representative.
~'/Cylinders
8 93384 LAB i 08/27/93i 10 4890
picked
up
by
ALPHA
· ! laboratory.
: 9 93384:. LAB 09/! 4/93i 28 5490 [] Cylinders delivered to ALPHA
- i laboratory.
10 933841 LAB 09/14/93~ 28 5640 mpression tesl results comply with
applicable specifications.
[] Compression test results do not comply
with applicable specifications.
CLIENT MADE
, 28 4200
TYPE OF FRACTURE, IF OTHER