Loading...
Gibbs Station 2-LR 930811 ALPHA TESTING, INC. REPORT OF CONCRETE 22o9 W scons,n St. COMPRESSION TEST Suite 100 Dallas, Texas 75229 (214) 620-8911 TESTEDFOR GIBBS STATION, LTD DATE: 08/11/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT: GIBBS STATION OURREPORTNO. 93384--2 PHASE II COPPELL, TEXAS FIELD DATA SANITARY SEWER LINE 'B' LOCATION OF CONCRETE PLACEMENT STA. 0+00 & STA. 1+63 08/11/93 PLANT 1 DATE PLACED 5 -' 15, DELIVER TICKET NO. 44024 TIME 1 , 5" MIX PROPORTIONS (SSD) N/A SLUMP AIR CONTENT N/A CEMENT AIR TEMPERATURE 98 WATER N/A CONCRETE TEMPERATURE 95 FINE AGGREGATE N/A DATE RECEIVED 08/13/93 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY DRB ADMIXTURE N/A MIX DATA SUBMITTED BY REDI-MIX REMARKS COMPRESSION TEST RESULTS '~T~' Cylinders made by ALPHA (NOMINAL CYLINDER SIZE 6- X 12") representative. Lab. Customer i Type Date A~e Comprmive 1~_ Cylinders made by Architect's No. No. [ Curing Tilted Days St~ln~th, Psi or Contractor's representative. ' ylinders picked up by ALPHA 1 933841 LAB 08/18/93 7 i 2750 laboratory. 93384 " 2 ~ LAB 09/08/93 28 4090 [] Cylinders delivered to ALPHA ! , :1 ! laboratory. 3 933841 LAB 09/08/93! 28 4040 [:~-mpression test results comply with ! applicable specifications. 4 93384 LAB HOLD ~ Compression test results do no{ comply with applicable specifications. sp~,~,c~,,o-~ 28 4000 TYPE OF FRACTURE, IF OTHER