Gibbs Station 2-LR 930811 (2) ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas. Texas 75229 DAILY FIELD REPORT (214) 620-8911 TESTED FOR DATE GIBBS STATION, LTD O8/11/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT GIBBS STAT[ON OURREPORTNO. 93384--1 PHASE II COPPELL, TEXAS WEATHER: CLEAR 08/1 1/93 TEMPERATURE RANGE: B6 TO: 1_ 03 ALPHA Representative: D. a . THE ALPHA TECHNICIAN TRAVELLED TO THE PROJECT SITE AS REQUESTED BY THE CLIENT'S REPRESENTATIVE, TO PERFORM CONCRETE TESTING. THE TECHNICIAN ARRIVED AT PROJECT SITE AS SCHEDULED FOR 3:30 P.M. HOWEVER, THE CONCRETE PLACEMENT WAS DELAYED AND DID NOT BEGIN UNTIL. APPROXIMATELY 4:20 P.M. THE TECHNICIAN CAST ONE SET OF FOUR CYLINDERS FROM CONCRETE PLACED FOR MANHOLE ON THIS DATE. FIELD TESTING APPEARED TO COMPLY WITH PROJECT SPECIFICATIONS. THE CONTRACTOR'S REPRESENTATIVE WAS INFORMED OF ALL TEST RESULTS LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT.