Gibbs Station 2-LR 930811 (2) ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas. Texas 75229 DAILY FIELD REPORT
(214) 620-8911
TESTED FOR DATE
GIBBS STATION, LTD O8/11/93
C/O HEATH & KNIGHT PROPERTIES
DALLAS, TEXAS
PROJECT GIBBS STAT[ON OURREPORTNO. 93384--1
PHASE II
COPPELL, TEXAS
WEATHER: CLEAR 08/1 1/93
TEMPERATURE RANGE: B6 TO: 1_ 03
ALPHA Representative: D. a .
THE ALPHA TECHNICIAN TRAVELLED TO THE PROJECT SITE AS REQUESTED BY THE
CLIENT'S REPRESENTATIVE, TO PERFORM CONCRETE TESTING.
THE TECHNICIAN ARRIVED AT PROJECT SITE AS SCHEDULED FOR 3:30 P.M. HOWEVER,
THE CONCRETE PLACEMENT WAS DELAYED AND DID NOT BEGIN UNTIL. APPROXIMATELY
4:20 P.M.
THE TECHNICIAN CAST ONE SET OF FOUR CYLINDERS FROM CONCRETE PLACED FOR
MANHOLE ON THIS DATE. FIELD TESTING APPEARED TO COMPLY WITH PROJECT
SPECIFICATIONS.
THE CONTRACTOR'S REPRESENTATIVE WAS INFORMED OF ALL TEST RESULTS
LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT.