Loading...
Gibbs Station 2-LR 931029 (11) ALPHA TESTING, INC. REPORT OF CONCRETE 2209 W,scons,n S,. COMPRESSION TEST Suite 100 Dallas. Texas 75229 (214) 620-8911 TFSTEDFOR GIBBS STATION, LTD DATE: 10/29/93 C/O HEATH & KNIGHT PROPERTIES DALLAS, TEXAS PROJECT GIBBS STATION OURREPORTNO. 93384--49 PHASE II cu~ELL, TEXAS FIE LD DATA LOCATION OF CONCRETE PLACEMENT PAVEHENT CREEK CROSSING STA. 9+00 DATE PLACED 10/29/93 PLANT ON SITE TIME 12 = 50 DELIVER TICKET NO. SLUMP 2 · 5" MIX PROPORTIONS (SSD) AfR CONTENT 5.4 CEMENT AIR TEMPERATURE 64 WATER CONCRETE TEMPERATURE 71 FINE AGGREGATE N/A DATE RECEIVED 10/30/93 COARSE AGGREGATE FIELD DATA SUBMITTED BY DW ADMIXTURE MIX DATA SUBMITTED BY EH LACY COMPRESSION TEST RESULTS REMARKS (NOMINAL CYLINDER SIZE 6" X 12"l ~---~- Cylinders made by ALPHA representative. Lab. Customer Type Dltl DiA~VI Comprlllive ~ Cylinders made by Archffect's No. No. i Curing T~ed S~ength, I~si or Contractor's representative. 61_ 93384 LAB 1_ 1_/05/93 7 3950 ~__~'"Cylinders picked up by ALPHA laboratory. 62 93384 LAB 11/26/93 28 5.600 ~ Cylinders delivered to ALPHA laboratory. 63 93384 LAB 11/26/93 28 5 2 10 ~_j{'"~"-C°mpression test results comply applicable specifications. 64 93384 LAB HOLD ~_1 Compression test results do no~ comply with applicable specificabons. T~,~URE. IF OTHE~R