Gibbs Station 2-LR 931006TESTED FOR
PROJECT
ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620 -8911
GIBBS STATION, LTD
C/O HEATH KNIGHT PROPERTIES
DALLAS, TEXAS
GIBBS STATION
PHASE II
COPPELL, TEXAS
WEATHER:
ALPHA Representative:
CLEAR
T.E.
TECHNICIAN RETURNED TO THE LABORATORY.
DATE
OUR REPORT NO.
DAILY FIELD REPORT
10/06/93
TEMPERATURE RANGE: 80 TO: 85
93384 -25
THE ALPHA TECHNICIAN TRAVELLED TO THE PROJECT SITE AS REQUESTED BY THE
CLIENT'S REPRESENTATIVE, TO OBTAIN SOIL SAMPLES FOR LABORATORY LIME SERIES
ANALYSIS.
UPON ARRIVAL, THE TECHNICIAN WAS INFORMED THAT THE SAMPLE PICK UP HAD BEEN
CANCELLED.
CONVERSATION BETWEEN THE CONTRACTOR'S REPRESENTATIVE AND THE CITY INSPECTOR
HAD RESOLVED THE ISSUE ON STABILIZATION PROCEDURE FOR AN AREA OF SUBGRADE
THAT CONTAINED MORE SANDY MATERIAL THAN THE SURROUNDING AREAS WHICH WERE TO
RECEIVE LIME. SUBSEQUENT CONVERSATION WITH THE CONTRACTOR CONFIRMED THAT
THE AREA WAS SCHEDULED TO RECEIVE CEMENT IN LIEU OF LIME STABILIZATION.