Loading...
Gibbs Station 2-LR 931006TESTED FOR PROJECT ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620 -8911 GIBBS STATION, LTD C/O HEATH KNIGHT PROPERTIES DALLAS, TEXAS GIBBS STATION PHASE II COPPELL, TEXAS WEATHER: ALPHA Representative: CLEAR T.E. TECHNICIAN RETURNED TO THE LABORATORY. DATE OUR REPORT NO. DAILY FIELD REPORT 10/06/93 TEMPERATURE RANGE: 80 TO: 85 93384 -25 THE ALPHA TECHNICIAN TRAVELLED TO THE PROJECT SITE AS REQUESTED BY THE CLIENT'S REPRESENTATIVE, TO OBTAIN SOIL SAMPLES FOR LABORATORY LIME SERIES ANALYSIS. UPON ARRIVAL, THE TECHNICIAN WAS INFORMED THAT THE SAMPLE PICK UP HAD BEEN CANCELLED. CONVERSATION BETWEEN THE CONTRACTOR'S REPRESENTATIVE AND THE CITY INSPECTOR HAD RESOLVED THE ISSUE ON STABILIZATION PROCEDURE FOR AN AREA OF SUBGRADE THAT CONTAINED MORE SANDY MATERIAL THAN THE SURROUNDING AREAS WHICH WERE TO RECEIVE LIME. SUBSEQUENT CONVERSATION WITH THE CONTRACTOR CONFIRMED THAT THE AREA WAS SCHEDULED TO RECEIVE CEMENT IN LIEU OF LIME STABILIZATION.