Gibbs Station 2-CS 950323 DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Gibbs Station, Phase Two, Replat of Lot 35, Block E, to change the
locat~n of a variable width floodway/floodplain easement on Lot 35,
Block E located at the intersection of Gibbs Crossing and Creek
Crossing, at the request of Dowdey, Anderson & Associates, Inc.
DRC DATE: March 23, 1995 & March 30, 1995
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 004-3679)
COMMENT STATUS: INITIAL PRELIMINARY ~FINAL
Platting Comments:
No Comments.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Gibbs Station, Phase Two, Replat of Lot 35, Block E, to change the
location of a variable width Jloodway/~lain easement on Lot 35,
Block E located at the intersection of C~bs Crossing and Creek
Crossing, at the request of Dowdey, Anderson & Associates, Inc.
DRC DATE: March 23, 1995 & March 30, 1995
CONTACT: Ken Griffin, P.E., Assistant City Manager/Ci~ Engineer 004-3679)
COMMENT STATUS: ~' INITIAL ./'PRELIMINARY FINAL
Platting Comments:
1. The bearing and length of the floodplain easement line should be shown.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Gibbs Station, Phase Two, Replat of Lot 35, Block E, to change the
location of a variable width floodway/floodplain easement on Lot 35,
Block E located at the intersection of Gibbs Crossing and Creek
Crossing, at the request of Dowdey, Anderson & Associates, Inc.
DRC DATE: March 23, 1995 & March 30, 1995
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679)
COMMENT STATUS: / INITIAL PRELIMINARY FINAL
Platting Comments:
1. The bearing and length of the floodplain easement line should be shown.