Loading...
Gibbs Station 2-CS 950323 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Gibbs Station, Phase Two, Replat of Lot 35, Block E, to change the locat~n of a variable width floodway/floodplain easement on Lot 35, Block E located at the intersection of Gibbs Crossing and Creek Crossing, at the request of Dowdey, Anderson & Associates, Inc. DRC DATE: March 23, 1995 & March 30, 1995 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 004-3679) COMMENT STATUS: INITIAL PRELIMINARY ~FINAL Platting Comments: No Comments. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Gibbs Station, Phase Two, Replat of Lot 35, Block E, to change the location of a variable width Jloodway/~lain easement on Lot 35, Block E located at the intersection of C~bs Crossing and Creek Crossing, at the request of Dowdey, Anderson & Associates, Inc. DRC DATE: March 23, 1995 & March 30, 1995 CONTACT: Ken Griffin, P.E., Assistant City Manager/Ci~ Engineer 004-3679) COMMENT STATUS: ~' INITIAL ./'PRELIMINARY FINAL Platting Comments: 1. The bearing and length of the floodplain easement line should be shown. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Gibbs Station, Phase Two, Replat of Lot 35, Block E, to change the location of a variable width floodway/floodplain easement on Lot 35, Block E located at the intersection of Gibbs Crossing and Creek Crossing, at the request of Dowdey, Anderson & Associates, Inc. DRC DATE: March 23, 1995 & March 30, 1995 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679) COMMENT STATUS: / INITIAL PRELIMINARY FINAL Platting Comments: 1. The bearing and length of the floodplain easement line should be shown.