Loading...
Gibbs Sta DCEC-CS 940419 ~ Specialists in Gabion Construction, ~~el_~/~l~S Craig Olden, Inc. Erosion Control Structures ~ ~.;> General Contractors__. For Two Decades April 19, 1994 City ofCoppell P. O. Bc~ 478 Coppell TX75019 FAX# 393-0948 Attention: Mr. Tarry Davis Construction Inspector RE: Embankment St~bilityRemediation Block E, Lots 28 and29, Gibbs Station I~nase II 912 Creek Crossir~- 916CreekCrossing- 920CreekCrossing 924 C~Crossir~- 928 Creek Cro~sing- 932 Creek Crossirlg Coppell, Texas OOINC 94-08 Dear Mr. D~vis, By this letter, we respectfully requestpermissiontoworkonSaturday, April 23, 1994 at the above project siteEast of Creek Crossing. We agree to pay anyovertimecharges requiredto~mployyourservices as Construction Inspector for the City of Coppell. We will begin work at 8:00 A.M. and cease no later than 5:00 P.M. We will call you before 4:00 P.M. on Friday, April 22nd should we decide not to work on the aforementioned date. If you have anyq~estionscor~er~this project, please donothesitate sincerely, flaris Dixon Construction Superintendent C~ recyc,ed paper P.O. Box 1500 · Little Elm, Texas 75068 Dallas Metro 214/294-5000 -D/FW Metro 214/691-1815 ,1-800-GABIONS · FAX 214/294-2664