Loading...
Gifford Hill-CS 890320 MEMORANDUM March 20, 1989 TO: Steve Goram, Director of Public Works FROM: Howard Pafford, Water Utilities Foreman~ RE: Gifford Hill Batch Plant @ Hwy. 121 (Status on Inspection) Tickler 3/20/89 I met with Linda Varonich and Sam Hubbard on January 9, to inspect the portion of renovation at the Gifford Hill Plant that controlled the outfall of storm water. The filtration basin they have installed seems to work as they had planned it to. All storm water from the site has to run through this filtration basin. Additionally, Linda asked Sam Hubbard to locate the underground septic tank and have it added to the plans in its exact location. From talking to Linda about three weeks ago, she informed me she was still waiting on that information. We will also be doing periodic inspections of the filtration basin's discharge water to insure that its performance does not deteriorate. If you have any questions regarding this matter, please advise.