Gibbs Station 2-CS 940118 (2) COPPELL PUBLIC WORKS
MEMORANDUM
DATE: January 18, 1994
TO: Larry Davis,Construction Inspector
FROM: Howard Pafford,Utilities Superinte:nden
2nd Follow-Up Walk-Through on Gibbs Station
Phase II
Utilities personnel performed a 2nd follow-up walk-thru on the
above referenced project and found the following items to be
deficient at this time.
* Once the wall and sidewalk contractor have completed
their projects, it will be necessary to insure that all
water and sanitary sewer components are at grade and
operational.
Please insure that these items are addressed prior to acceptance
of this project.
HLP/hlp
WALKTHRU.GIBBSII.HLP