Loading...
Gibbs Station 2-CS 940104 COPPELL PUBLIC WORKS MEMORANDUM DATE: January 4, ] 994 TO: Steven O. Ooram, Director of Public Works f~/] FROM: Howard L. Pafford, Utilities Superintendent '~...- RE: Walk-Through/Pullclllist for Oibbs Station Phase II (Water/Sanitary So;var) Water Utilities personnel have performed a walk fl~rough of the above refereJ~ced project. The following items were found to be deficient during the walk through. I. Manhole at Sm # 2 + 50 Ln D - Tighten bottom band on chimney seal. 2. Manhole at Sm # 17 + 25.87 Ln B - Lateral entering manhole inverted. 3. Manhole at Sm # 12 + 90.31 Line B - Bottom band on chimney seal ncexls tightened. 4. Sta # 5.100 Ln C - End manhole lateral entering in 5. Sm 6 + 63.70 Ln B - Lateral e~tering manhole in inverted. 6. St:, # 1 + 63.70 - Maqhole chimney seal needs reset and dirt cleaned on! or bottom. 7. Sm # 0 + 00 Ln B - Remove bucket inside manhole. 8. Valves in pavement at Oibbs Crossing and Village Parkway need blockouts not str~et cuts. Repair at both ends of street. 9. Fire Hydrant at Block A Lot 17 and 16 needs to be low,red. 10. Valve at Burns Crossing and Village Pm'kway needs pad repoured. 11. 2" Blow-off on Round Rock Circle needs 90" lurned up. 12. Lots 1- 4 Block D - Dirt covtracto,' needs to be brought back to repair existing lot clean outs and existing meter service can. 13. Wall contractors neexl to u~cover and expose existing manholes and water valves on MacArthur easement. 14. Existing mainline valve al Lot 6 Block B needs stacked and hole filled in and pad repoured. Please ensure thai. each of the. se ite.,ns arc correcled prior to acceptance of this project. HLP/dm WALKTHRU.HLP/GIBBSll