Loading...
Grand Cove-CS0000427 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Memo to File From: Garreth Campbell, Construction Inspector- Date: April 27, 2000 RE: Peccarelli Residence, 513 Wales Court As of thi~ date, the retaining wall along the creek bank has been completed to our specifications. This being a private project and having no work in the City's right- of-way or easement(s), no maintenance bonds or record drawings (asbuilts) are required. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"