Loading...
Grand Cove-CS 990903TRANSMITTAL LETTER PROJECT: Stream Erosion Control PROJECT NO.: 99001 Iname, address) Mr. And Mrs. Mark Peccarelli Residence OATE: September 3, 1999 TO: Mr. Michael Martin City of Coppeli Coppell, Texas 75019 WE TRANSMIT: IX) herewith ( ) under separate cover via ( ) in accordance with your request FOR YOUR: ( ) approval ( ) distribution to parties IX) information IX) review & comment ( ) record ( )use ( ) THE FOLLOWING: IX) Drawings ( ) Shop Drawings Prints ( ) Samples ( ) Specifications ( ) Shop DraxvingReproducibles ( ) Product Literature ( ) Change Order ( ) "As-built" Construction Drawings COPIES DATE REg' DESCRIPIION ACTION NO CODE 4 9/1/99 Complete set of bluelines I 9;1..'99 Letters fi.om home owners I 9/I/99 Red Mark set from Cit3~ of Coppeli ACTION A. Action indicated on item transmitted D. For signature and forwarding as noted below under REMARKS CODE B. No action required E. See REMARKS beloxv · C. For signature and return to this office REMARKS: Doyle Engineering Group FileCOPIES TO: (with enclosures) [][][] FAxD aSl~aSs0,214214~Be~J [] BY: Van Weese -- ONE PAGE