Grand Cove-CS 940426 Coppell, Texas 75019
-.-~.-,~ /~ ,~.,.., ~.~ ,--- -...-,z.~_...~;..~:~ ~ -.-.-. /
The City With A Beautiful Future 214-462-0022
April 26, 1994
Mr. Bill Anderson
Dowdey, Anderson and Associates, Inc.
16250 Dallas Parkway
Suite 100
Dallas, Texas 75248
RE: Grand Cove Estates
Development Fee Assessment
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for Grand Cove Estates.
Please provide a check made payable to the City of Coppell in the amount of $ 38,335.00 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment
List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the
construction inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
cc: Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
CITY OF COPPELL
DEVELOPMENT FEES
Date: April 26,1994
Project: Grand Cove Estates
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $14,300.00 $14,300.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $ 2,200.00 -0-
(100% due at Issuance of Building Permit)
Wastewater Impact Fee $ 9,900.00 $ 9,900.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee $ 2,200.00 -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $1,100.00 -0-
(100% due at Issuance of Building Permi0
Water Meter Fee (Domestic) $ 489.50 -0-
(100% due at Issuance of Building Permit)
Water Meter Deposit (residential) $ 660.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire) -0- -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit -0- -0-
(100% due at Issuance of Water Meters)
Street Sign Fee $ 299.07 -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Park Fee $ 28,270.00 $14,135.00
(50% due prior to Council Approval) 50% =$14,135.00
(50% due prior to Issuance of Building Permi0 50% =$14,135.00
Construction Inspection Fee need submittal of -0-
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $ 59,418.57
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 38,335.00
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: April 19, 1994
TO: Engineering Department
FROM: Public Works Staff
RE: Development Fees for Grand Cove Estates
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
22 - 5/8" x 3/4" Domestic Meter/s = 22 ESU's
- Irrigation Meter/s = ESU's
- Fireline Meter/s = ESU's
Total 22 ESU's @ $650.00 ea = $14,300.00
100% due prior to Council approval of the final plat.
Wastewater Impact (City)
22 - 5/8" x 3/4" Domestic Meter/s = 22 ESU's
Total 22 ESU's @ $450.00 ea = $ 9,900.00
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
22 Connections ~ $100.00 each = $ 2,200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
22 Connections @ $100.00 each = $2,200.00
100% due prior to issuance of building permit. (Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
22 lots @ $50.00/lot = $1,100.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
22 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 489.50
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Deposit (Residential)
22 Meters @ $30.00 ea = $ 660.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
Residential Lots at $150.00 each = $
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
Development Fees
Page 3
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
22 Residential Lots at $1,285.00 each = $28,270.00
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
cc: Steven G. Goram, Director of Public Works
G. Greg Jones, Chief Building Official
Development Fees
Page 4
STREET SIGN ASSESSMENT
for Grand Cove Estates
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE OUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 3 $190.62
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85 1 96.85
OTHER
No Outlet $11.60 1 11.60
TOTAL $299.07
* Cost breakdowns may be obtained from Public Works by written
request.
DEVFEES.HLP Revised 1/14/94