Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-CR 960507
G~O- ~ CO~;~ULTING ENGINEERS IN: T~F~ £nvironmenta[ Assessments ~,.~e Soils & Foundations Construction Hateria[s Testing "ExcettencebyExperience" Commercial &Industria[ Inspection PO Box 92548 · Southlske, Texas 76092 · (817) 329-0281 DAILY CONSTRUCTION REPORT PROJECT: Copperstone LOCATION: Coppell JOB #: 95-1522 DATE: 05-07-96 DAY: Tuesday TIME: 10am-12noon lpm-3pm CLIENT: Copperstone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp ACTIVITIES: WEATHER: Ptly Cloudy LOW TEMP: 70F HIGH TEMP: 89F Travelled to job site, as requested, to make eight (8) concrete test cylinders. Returned to office. SET #52 LOCATION: Southside Bridge Deck, west end SLUMP: 3.5" AIR: 5.1% TEMP: AT 77/CT 73 TIME: ll:45am SET $53 LOCATION: Southside Bridge Deck, east end SLUMP: 4.0" AIR: 5.0% TEMP: AT 92/CT 80 TIME: 2:30pm Jeff Holden Technician