DAILY CONSTRUCTION REPORT
PROJECT: Copper Stone LOCATION: Coppell
JOB #: 95-1522 DATE: 03-15-96 DAY: Friday TIME: 7am-lpm
CLIENT: Copper Stone Ltd CONTRACTOR: Glenn Thurman, Inc
c/o Briscoe Clark Comp
ACTIVITIES:
WEATHER: Clear LOW TEMP: 56F HIGH TEMP: 86F
Travelled to job site, as requested, to make eight (8) concrete
test beams and to pick up eight (8) concrete test cylinders made on
03-14-96. Returned to office.
SET #39
LOCATION: Auburn Way @ Station 0+29 UNIT WT: 146.7
SLUMP: 6.5" AIR: 4.7% TEMP: AT 56/CT 62 TIME: 8:00am
SET #40
LOCATION: Parkway Blvd @ Station 39+00
SLUMP: 3.5" AIR: 5.0% TEMP: AT 76/CT 67 TIME: 12 noon
Glenn Hutchinson
Technician