Loading...
Copperstone-CR 960313 (2) G~O- ~ CO"~ULTING ENGINEERS T~r~e Environmentat Assessments ~1~, SoiLs & Fou~ations Construction MateriaLs Testing .ExceLLence by Ex~rience" Cmrcia[ & l~ustria[ [ns~ction PO Box 925~8 · South[ake, Texas 76092 · (81r) ~29-0~81 DAILY CONSTRUCTION REPORT PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE: 03-13-96 DAY: Wednesday TIME: lpm-4pm CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations ACTIVITIES: WEATHER: Clear LOW TEMP: 48F HIGH TEMP: 73F Travelled to job site, as requested, to make eight (8) concrete test cylinders and to pick up four (4) concrete test cylinders made on 03-12-96. Returned to office. SET #33 LOCATION: 40' drilled pier I SLUMP: 6.5" AIR: 3.7% TEMP: AT 63/CT 69 TIME: 2:45pm SET #34 LOCATION: backwall, west abutment SLUMP: 3.0" AIR: 3.5% TEMP: AT 65/CT 73 TIME: 3:45pm Glenn Hutchinson Technician