Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Copperstone-CR 960312 (2)
G~'O- --- CO}~ULTING ENGINEERS IN: T~XQ~e ~nvironmental Assessments ~ Soils & Fou~a~Jons Construction Ha~erJaLs Testing .~ce[[e~eby~rJe~e" C~rcJa[ & Z~ustcJat lns~ctJon PO Box 925~8 * S~thLake, Texas 7~92 * (817) ~29-0281 D~.ILY CONBTRUCTION REPORT PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE: 03-12-96 DAY: Tuesday TIME: 6am-2pm CLIENT: Copper Stone Ltd CONTRACTOR: Glenn Thurman, Inc c/o Briscoe Clark Comp ACTIVITIES: WEATHER: Clear LOW TEMP: 41F HIGH TEMP: 68F Travelled to job site, as requested, to make eight (8) concrete test beams and four (4) concrete test cylinders. Also picked up twenty (20) concrete test beams made on 03-11-96. Returned to office. SET ~B-11 LOCATION: Parkway Blvd @ Station 36+00 ~NIT WT: 146.7 SLUMP: 2.5" AIR: 5.5% TEMP: AT 41/CT 51 TIME: 7:45am SET #B-12 LOCATION: Parkway Blvd @ Station 33+00 SLUMP: 2.5" AIR: 5.5% TEMP: AT 42/CT 52 TIME: 9:30am SET #B-13 LOCATION: Parkway Blvd@ Station 31+00 UNIT WT: 146.7 SLUMP: 4.5" AIR: 5.5% TEMP: AT 45/CT 55 TIME: ll:30am SET #B-14 LOCATION: Parkway Blvd @ Station 29+25 SLUMP: 3.0" AIR: 5.5% TEMP: AT 45/CT 53 TIME: 12:30am SET ~32 LOCATION: Intersection, Copperstone Trl & Auburn Way UNIT WT: 146.7 SLUMP: 4.5" AIR: 4.8% TEMP: AT 56/CT 55 TIME: 1:30pm Glenn Hutchinson Technician