Copperstone-CR 960311
~3- ~-- C~ULTIN~ ENGINEERS IN: T~'~e Environmental Assessmnts ~ Soils & Fou~ations Construction ~aterJaLs Testing "~ce[[e~ebyEx~rience" C~rcia[ & I~ustria[ ins~ction PO Box 925~8 · South[ake, Texas 7609~ · (817) ~29-0281 DAILY CONSTRUCTION REPORT PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE: 03-11-96 DAY: Monday TIME: 12noon-3pm CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations ACTIVITIES: WEATHER: Clear LOW TEMP: 38F HIGH TEMP: 65F Travelled to job site, as requested, to make eight (8) concrete test cylinders. Returned to office. SET #29 LOCATION: center bent #2 SLUMP: 6.5" AIR: 4.0% TEMP: AT 63/CT 67 TIME: l:45pm SET #30 LOCATION: 72' drilled pier C, east abutment SLUMP: 6.5" AIR: 4.0% TEMP: AT 64/CT 66 TIME: 2:45pm Glenn Hutchinson Technician