Loading...
Copperstone-CR 960311 (2) '~-- ._ CONSULTING ENGINEERS IN: ~,XQ~e :nvJror~enta[ Assessments ~, Soils & Fo~ations Construction Hater~als Testing -~ce~e~eby~rience" C~rciat & i~ustrJa[ lns~ction PO Box 9254~ · Southtake, Texas 76092 * (817) DAILY CONSTRUCTION REPORT PROJECT: Copper Stone LOCATION: Coppell JOB ~: 95-1522 DATE: 03-11-96 DAY: Monday TIME: 8am-7:30pm CLIENT: Copper Stone Ltd CONTRACTOR: Glenn Thurman, Inc c/o Briscoe Clark Comp ACTIVITIES'. WEATHER: Clear LOW TEMP: 38F HIGH TEMP: 65F Travelled to job site, as requested, to make twenty (20) concrete test beams. Returned to office. SET #B-1 LOCATION: Parkway Blvd @ Station 30+50 UNIT WT: 146.8 SLUMP: 3.0" AIR: 5.3% TEMP: AT 55/CT 63 TIME: 8:45am SET #B-2 LOCATION: Parkway Blvd @ Station 33+00 SLUMP: 2.5" AIR: 5.5% TEMP: AT 58/CT 63 TIME: 9:30am SET #B-3 LOCATION: Parkway Blvd @ Station 36+64 UNIT WT: 146.7 SLUMP: 3.0" AIR: 5.3% TEMP: AT 58/CT 61 TIME: 10:30am SET #B-4 LOCATION: Parkway Blvd @ Station 40+00 SLUMP: 3.0" AIR: 5.0% TEMP: AT 62/CT 61 TIME: ll:40am SET #B-5 LOCATION: Parkway Blvd @ Station 44+50 UNIT WT: 146.5 SLUMP: 3.5" AIR: 5.5% TEMP: AT 62/CT 63 TIME: 12:30pm SET #B-6 LOCATION: Parkway Blvd @ Station 49+00 SLUMP: 3.0" AIR: 5.3% TEMP: AT 64/CT 60 TIME: l:30pm SET #B-7 LOCATION: Parkway Blvd @ Station 48+50 UNIT WT: 146.8 SLUMP: 2.0" AIR: 5.5% TEMP: AT 67/CT 60 TIME: 2:30pm SET #B-8 LOCATION: Parkway Blvd@ Station 45+50 SLUMP: 2.0" AIR: 5.5% TEMP: AT 67/CT 61 TIME: 3:30pm SET #B-9 LOCATION: Parkway Blvd @ Station 41+50 UNIT WT: 146.6 SLUMP: 2.5" AIR: 5.5% TEMP: AT 66/CT 63 TIME: 4:30pm SET #B-10 LOCATION: Parkway Blvd @ Station 39+00 SLUMP: 2.5" AIR: 5.5% TEMP: AT 66/CT 62 TIME: 6:00pm Glenn Hutchinson Technician