DAILY CONSTRUCTION REPORT
PROJECT: Copper Stone LOCATION: Coppell
JOB #: 95-1522 DATE: 03-01-96 DAY: Friday TIME: lpm-3pm
CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction
c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations
ACTIVITIES:
WEATHER: Ptly Cloudy LOW TEMP: 46F HIGH TEMP: 60F
Travelled to job site, as requested, to make eight (8) concrete
test cylinders and to pick up four (4) concrete test cylinders made
on 02-29-96. Returned to office.
SET #17
LOCATION: center bent, Column D
SLUMP: 4.0" AIR: 3.5% TEMP: AT 51/CT 68 TIME: 2:00pm
SET #18
LOCATION: 72' drilled pier C, west abutment
SLUMP: 6.5" AIR: 3.0% TEMP: AT 51/CT 67 TIME: 2:45pm
Glenn Hutchinson