Loading...
Copperstone-CR 960301 (2) G~)-- ~ CON. G. ULTING ENGINEERS IN: ~~~'~e :nvironmentaL Assessments ~ SoiLs & Fou~ations C~st~uction ~ate~iats Testing "ExceLLence by Ex~ience" C~cia[ & I~ust~ia[ Ins~ction PO Box 925~8 · S~th[ake, Texas 76~2 · (817) 329-0281 DAILY CONSTRUCTION REPORT PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE: 03-01-96 DAY: Friday TIME: lpm-3pm CLIENT: Copper Stone Ltd CONTRACTOR: Clack Construction c/o Briscoe Clark Comp SUB-CONTRACTOR: Beck Foundations ACTIVITIES: WEATHER: Ptly Cloudy LOW TEMP: 46F HIGH TEMP: 60F Travelled to job site, as requested, to make eight (8) concrete test cylinders and to pick up four (4) concrete test cylinders made on 02-29-96. Returned to office. SET #17 LOCATION: center bent, Column D SLUMP: 4.0" AIR: 3.5% TEMP: AT 51/CT 68 TIME: 2:00pm SET #18 LOCATION: 72' drilled pier C, west abutment SLUMP: 6.5" AIR: 3.0% TEMP: AT 51/CT 67 TIME: 2:45pm Glenn Hutchinson Technician