Loading...
Copperstone-CR 960229 (2) ~ ~ COI~ULTING ENGINEERS IN: T~XQ~e ,-~vi ronmenta [ Assessments ~ Soits & Foundations Construction MateriaLs Testing .Excellence by Experience" Commercial & Industrial Inspection PO Box 92548 · South[ake, Texas ?6092 · (817) 329-0281 DAILY CONSTRUCTION REPORT PROJECT: Copper Stone LOCATION: Coppell JOB #: 95-1522 DATE: 02-29-96 DAY: Thursday TIME: 8am-4:30pm CLIENT: Copper Stone Ltd CONTRACTOR: Glenn Thurman, Inc c/o Briscoe Clark Comp ACTIVITIES: WEATHER: Cloudy & Cool LOW TEMP: 32F HIGH TEMP: 39F Travelled to job site, as requested, to make sixteen (16) concrete test cylinders. Returned to office. SET #5 LOCATION: Copperstone Crt @ Station 1+50 SLUMP: 6.0" AIR: 4.5% TEMP: AT 32/CT 45 TIME: 10:30am SET #6 LOCATION: Avalon @ Station 2+00 SLUMP: 3.0" AIR: 3.8% TEMP: AT 36/CT 44 TIME: ll:30am SET #7 LOCATION: Avalon @ Station 6+60 SLUMP: 3.0" AIR: 4.0% TEMP: AT 39/CT 49 TIME: l:30pm SET #8 LOCATION: Avalon @ Station 9+00 SLUMP: 3.5" AIR: 4.0% TEMP: AT 39/CT 50 TIME: 3:lSpm Glenn Hutchinson Technician