Loading...
WA9302-CS 950706 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS F/~....g.. 'I 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOtIN W. BIRKHOFF. P.E. JOE R. GARTER, P.E. GARY C. HENDRICKS, P.E. C. L. SHIMEK, P.E. 1. C. FINKLEA, P.E. JAMES E. LAUGHLIN, P.E. Natgun Corporation 11 Teal Road Wakefield, Ma 01880 Re: City' of Coppell, Texas Village Parkway Ground Storage Reservoir No. 2 Project No. WA-9302 Gentlemen: A Pre-Construction conference for the construction of the City' of City' of Coppell, Village Parkway Ground Storage Reservior No. 2, has been scheduled for Thursday, July 13, 1995, at 2:00 p.m. The conference will be held at the City of Coppell's Library' in the ConfereHce Roo~n (177 Heaaz Road). We are enclosing a preliminary meeting agenda for your review' and use in preparing for the pre-construction conference. It is the City's intention to issue a work order to the contractor at this meeting. If you have any questions or need additional information, please do not hesitate to contact us. Sincerely yours, f ' /' ' "/'r , ' ,.- ,; //': ,,/-..'/,; ~.. ,: Gary C. Hendricks, P.E. Enclosure cc: Mr. Kenneth M. Griffin, P.E. Mr. Howard Pafford Mr. Larry Davis Mr. Garreth Campbell Send same letter to: Lone Star Gas 2000 Reliance Pkwy Bedford, Texas 76201 Attention: Shawn Michie, Project Coordinator TU Electric 14400 Josey Lane Farmers Branch, Texas 75234 Attention: Tim Brancheau G.T.E. 2094 McGee I~ane l~ewisville, Texas 75067 Attention: MaeBeth Whaley Paragon Cable 209 S. Rogers Irving, Texas 75060 Attention: Bill Morgan or Donhie Dunn Gee Consultants, Inc. 2540 Glenda Lane, Suite 108 Dallas, Texas 75229 Attention: Richard W. Gee, P.E. Mfimelc. .]acohs ~ l:inkk~a CITY OF COPPELL VILLAGE PARKWAY GROUND STORAGE RESERVOIR NO. 2 PROaECT NO. WA-9302 PRE-CONSTRUCTION CONFERENCE July 13, 1995, 2:00 p.m. AGENDA l ) Introductions (Attendmace Sheet) 2) Contractor's Superintendents & Phone Numbers (Item 1.30): · Day Ti~ne No. Night Time No. Mobil Number · Day Time No. Night Time No. Mobil Number 3 City of Coppell on site representatives: · Larry Davis -- Chief Inspector Day Time No. Night Time No. Mobil Number · Garreth Campbell Day Time No. Night Time No. Mobil Number 4) Subcontractors (Item 1.46): · 5) Utility Companies: · Lone Star Gas: · TU Electric: · G.T.E. Paragon Cable Shm~el~, .lucohs ~ Fin/:lea City of Coppell Village Parkway Ground Storage Reservior No. 2 Pre-Construction Conference Agenda July 13, 1995 Page No. 2 6) Contract Documents: 7) Construction Plans and Specifications (SC. 16): 8) Permits (Item 1.23): 9) Insurance Certificates (Ite~n 1.26): 10) Contractor's Construction Schedule (Item 1.22.5): 11) Contractor's Projected Cash Flow (Item 1.22.5): 12) Trench Safety Plan (SC.15) 13) Project Sign (SC.29) 14) Working Area and Project Sequence (Items 1.32, 1.29) 15) Sanitary Provisions (Item 1.29.1 ) 16) Shop Drawing Submittals (Ite~n 1.28) 17) Water tbr Construction -- Temporary Meter (Section 2, Item 2.21 ) 18) Line and Grade (Section 2, Item 2.9) 19) Work Order -- Time of Completion (Item 1.13, lte~n 1.16) 20) Contract Time, Working Days, Overtime Notification (Section 2, Item 2.19) 21) Monthly Pay Request, 5% Retainage (Item 1.51) 22) Extra Work and Change Orders (Item 1.38) 23) Materials Testing and Quality Control (SC. 19): · Field Representative: Phone No. 24) Maintenance Bond (SC-1.15) · Irrigation system guarantee (SC.28.9) 25) Final Inspection & Acceptance (Item 1.51.3) 26) Construction Record Drawings 27) Additional or Miscellaneous Comments