Loading...
Grapevine Creek-CS 911211 FILE OP¥ December 11, 1991 Mr. Pat Acker Albert H. Halff Associates 8616 Northwest Plaza Dr. Dallas, TX 75225 Re: Final Acceptance Gateway Business Park/Drop Structure Grapevine Creek Dear Mr. Acker: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell. Structure completion has been verified and is in compliance with the City of Coppell's standard requirements. Please follow the Erosion Control Ordinance, adopted by the City of Coppell, during the maintenance bond period. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (December 11, 1992). Construction Inspector CLD/bd cc: M. Shohre Daneshmand, Acting City Engineer Gary L. Sieb, Director of Planning and Community Services Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager Taryon Bowman, P&Z Coordinator Ben dela Cruz, Engineer Technician Tony Johnston, Gibson & Associates GRAPEFIN