Grapevine Creek-CS 911211 FILE OP¥
December 11, 1991
Mr. Pat Acker
Albert H. Halff Associates
8616 Northwest Plaza Dr.
Dallas, TX 75225
Re: Final Acceptance
Gateway Business Park/Drop Structure Grapevine Creek
Dear Mr. Acker:
A final inspection of the above referenced project has been confirmed by
representatives of the City of Coppell.
Structure completion has been verified and is in compliance with the City
of Coppell's standard requirements.
Please follow the Erosion Control Ordinance, adopted by the City of
Coppell, during the maintenance bond period.
The one-year maintenance bonds and as-built drawings have been received
from the contractor. Maturity on the bonds will be one year from the date
of this letter (December 11, 1992).
Construction Inspector
CLD/bd
cc: M. Shohre Daneshmand, Acting City Engineer
Gary L. Sieb, Director of Planning and Community Services
Howard Pafford, Water Superintendent
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation Manager
Taryon Bowman, P&Z Coordinator
Ben dela Cruz, Engineer Technician
Tony Johnston, Gibson & Associates
GRAPEFIN