Loading...
WA9302-CS 950525 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. May 25, 1995 C. L. SHIMEK, P.E. I. C. FINKLEA, P.E. JAMES E. LAUGHLIN, P.E. Natgun Corporation 11 Teal Road Wakefield, MA 01880 Re: City of Coppell, Texas Village Parkway Ground Storage Reservoir No. 2 Project No. WA-9302; Bid No. Q0395-1 Gentlemen: The City of Coppell, at their regular meeting on May 23, 1995, accepted your proposal for construction of the Village Parkway Ground Storage Reservoir No. 2 project in the amount of $2,809,305.00. We are enclosing six (6) copies of the following documents: · Proposal · Affidavit of Safety Record · Bid Schedule · Standard Form of Agreement · Bid Summary · Performance Bond · Bidder Qualification · Payment Bond · Bid Affidavit Please execute and return all six copies of each document to our office. Also, SC~ 1.58 of the Supplementary Conditions of the Agreement requires the development of a "separated contract" which separates charges for materials actually incorporated into the project from materials consumed during the construction of the contract and labor charges. Please furnish an itemized breakdown (per bid item) of: 1. Materials incorporated into the project. 2. Labor, equipment, supervision and materials not incorporated into the project After the agreement has been signed by the City, two complete copies of the contract documents and specifications will be furnished to you. The project Maintenance Bond shall be completed and executed prior to final payment on the project. Natgun Corporation May 25, 1995 Page No. 2 Also, please furnish the Certificates of Insurance as required by Item 1.26 - Insurance of the General Provisions, and Item 1.26.6 - Insurance of the City of Coppell Supplementary Conditions to the General Provisions of the specifications; and the Trench Safety Plan as required by SC. 15 - Trench Safety_ Systems of the Special Conditions of the standard specifications. We are enclosing one copy of the specification for your reference in preparing the necessary documents. If you have any questions or need additional information, please do not hesitate to contact this office. S incer/~~s~ ~jP.E. Enclosures cc: eMir. Kenneth M. Griffin, P.E. Mr. Howard Pafford